Wiring and Infrastructure
Document your lighting system's electrical infrastructure: transformers, cable runs, junction boxes, and lighting controllers.
Use lighting infrastructure objects to document power supplies, cable routes, junctions and controllers alongside the emitting fixtures. Their entered specifications describe the plan; the drawing is not a complete electrical-design certification.
Place the power supply
Open Lights → Power Wiring → Transformer. Select the placed object and record Capacity (VA), Input Voltage, Output Voltage and Notes under Details.
Place junctions and controls
Use Junction Box for a proposed branch enclosure, with Connections and IP Rating. Use Controls → Lighting Controller for the intended controller type and notes.
Trace the wiring
Choose Cable Run, draw at least two points and finish with Enter or a double-click. Under Path properties, record Cable type, Gauge and Installation. Each path is a documented route, not proof that nearby objects are connected.
Cross-check the equipment
Use the actual fixtures’ wattage and product specifications when evaluating the proposed supply and route. String Lights and LED Strip have their own technical fields. Capacity, cable gauge and control notes must describe the intended equipment.
Prepare the drawing
Use project layers and export settings to control the drawing you deliver. Check the resulting output rather than assuming every Inspector detail becomes an automatically printed installation schedule.